Completed Solar Project – Mosul (Nineveh) (5kW Hybrid System)
A 5kW hybrid solar system installed in Mosul (Nineveh), featuring 8 high-efficiency panels and a 10kWh battery, delivering reliable power while reducing CO₂ emissions by 5 tons annually.
Trees Equivalent:
Equivalent to 200 trees planted
Installation Date:
02-06-2025