Project Detail

Completed Solar Project – Sinjar (48kW System)

A 48kW residential solar system installed in Sinjar using 84 high-efficiency panels. The project delivers reliable clean energy while reducing CO₂ emissions by 53 tons annually, equivalent to planting 850 trees.
This project showcases the successful installation of a 48kW solar energy system in Sinjar, designed to provide reliable and sustainable power for residential use. Completed on 10 August 2024, the system utilizes 84 high-efficiency 580W solar panels to ensure optimal energy production under local environmental conditions.
The installation was engineered to maximize performance and long-term reliability, reducing dependence on conventional electricity sources while significantly lowering operating costs.
In addition to its economic benefits, the system contributes to environmental sustainability by reducing approximately 53 tons of CO₂ emissions, equivalent to planting around 850 trees.
Project Highlights:
* Location: Sinjar
* System size: 48kW
* Number of panels: 84 (580W each)
* Installation date: 10-08-2024
* CO₂ reduction: 53 tons
* Environmental impact: Equivalent to 850 trees planted
This project reflects our commitment to delivering efficient, durable, and environmentally responsible solar energy solutions.

Capacity:

48kW

Location:

Sinjar

CO2 Reduction:

53 tons

Tree Equivalent:

Equivalent to 850 trees planted

Installation Date:

10-08-2024

Equipment:

84 panels (580W each)

Get Started

Start Generating Your Own Energy

We’ll assess your needs and design a system that fits your usage, location, and budget.